Sabong, Cockfighting and Gamefowl News, Photo, Video; Derby News Schedule, Results, Breeding
 

Go Back   Sabong, Cockfighting and Gamefowl Posting Pit > Main Forums > Usapang Manok

Usapang Manok Tagalog forum. Pang MASINSINANG pag-uusap lamang tungkol sa manok.

Reply
 
Thread Tools Display Modes
Old April 9th, 2007, 01:20 PM   #1
dbm174
Senior Member
 
dbm174's Avatar
 
Join Date: Jan 2005
Location: LA / BACOLOD
Posts: 1,057
Thanks: 0
Thanked 1 Time in 1 Post
Cool magkano inabot pagpapabakod ng manukan nyo.....

tol tanong lang para magkaruon ako ng idea.....magkano ginastos nyo paglagay ng fence sa manukan nyo.........

gaaono kalaki farm nyo at anong materyales ginamit sa pagpapabakod.....hollowblocks..cyclone wire etc......ang taas.......at magkano inabot..........

ang manukan namin kasi mga 2.1 hectares...may temporaryong bakod...kawayan at barbwire pa lang............salamat

Last edited by dbm174; April 9th, 2007 at 01:28 PM.
dbm174 is offline   Reply With Quote
Old April 30th, 2008, 01:34 AM   #2
nardong_putik
Guest
 
Posts: n/a
Re: magkano inabot pagpapabakod ng manukan nyo.....

bro matanong ko lang. Ilng meters ba ang isang roll ng barbwire ?
And magkano?
  Reply With Quote
Old April 30th, 2008, 02:38 AM   #3
a2y
Senior Member
 
a2y's Avatar
 
Join Date: Mar 2008
Location: land of cockers
Posts: 752
Thanks: 0
Thanked 0 Times in 0 Posts
Re: magkano inabot pagpapabakod ng manukan nyo.....

Quote:
Originally Posted by dbm174
tol tanong lang para magkaruon ako ng idea.....magkano ginastos nyo paglagay ng fence sa manukan nyo.........

gaaono kalaki farm nyo at anong materyales ginamit sa pagpapabakod.....hollowblocks..cyclone wire etc......ang taas.......at magkano inabot..........

ang manukan namin kasi mga 2.1 hectares...may temporaryong bakod...kawayan at barbwire pa lang............salamat
tol depende sa gusto mo,baka mababa na
100thou.dyan sa lawak ng lugar mo.kasi gamit ka talaga semento pondasyon mo
at mga poste.labor,parekung may barbwire na e lagay ka nalang ng apat o tatlo na bahay kubo para mabantayan mga manok mo.syempre me mga tao ka naman ata
dyan.kung gusto mo safe e bakod na pader aba pare mahirap karkulohin maari tanong mo sa kakilala mong engineer.mas mainam.
a2y is offline   Reply With Quote
Old April 30th, 2008, 03:48 AM   #4
gingerhat
Member
 
gingerhat's Avatar
 
Join Date: Apr 2007
Posts: 345
Thanks: 0
Thanked 1 Time in 1 Post
Re: magkano inabot pagpapabakod ng manukan nyo.....

Naku kung pader yan! mahal sir. aabutin ng Milliones yan! pag bireb wire 700 pesos ata per 100 meters. hindi pa kasama Poste. Ang maganda, Bired Wire nalang, tapos lagyan mo ng ASO sa mga Kanto ng Paligid mo. Then Lagay ka isang Bahay sa Gitna, na at least hangang 3rd floor ang taas. then lagyan mo ng Pang Snipper doon sa Taas.
gingerhat is offline   Reply With Quote
Old April 30th, 2008, 03:55 AM   #5
a2y
Senior Member
 
a2y's Avatar
 
Join Date: Mar 2008
Location: land of cockers
Posts: 752
Thanks: 0
Thanked 0 Times in 0 Posts
Re: magkano inabot pagpapabakod ng manukan nyo.....

Quote:
Originally Posted by gingerhat
Naku kung pader yan! mahal sir. aabutin ng Milliones yan! pag bireb wire 700 pesos ata per 100 meters. hindi pa kasama Poste. Ang maganda, Bired Wire nalang, tapos lagyan mo ng ASO sa mga Kanto ng Paligid mo. Then Lagay ka isang Bahay sa Gitna, na at least hangang 3rd floor ang taas. then lagyan mo ng Pang Snipper doon sa Taas.
heheehhe patay kayo mga WAKATAN,maaring maubos na magnanakaw pagmay
sniper kana magaling,paghindi baka manokis mo pa tamaan
a2y is offline   Reply With Quote
Old April 30th, 2008, 04:02 AM   #6
jong72
Member
 
jong72's Avatar
 
Join Date: Sep 2007
Location: israel/ nueva ecijia/ isabela
Posts: 306
Thanks: 0
Thanked 0 Times in 0 Posts
Re: magkano inabot pagpapabakod ng manukan nyo.....

Quote:
Originally Posted by dbm174
tol tanong lang para magkaruon ako ng idea.....magkano ginastos nyo paglagay ng fence sa manukan nyo.........

gaaono kalaki farm nyo at anong materyales ginamit sa pagpapabakod.....hollowblocks..cyclone wire etc......ang taas.......at magkano inabot..........

ang manukan namin kasi mga 2.1 hectares...may temporaryong bakod...kawayan at barbwire pa lang............salamat

MALAKING PERA YAN KUNG HOLLOW BLOCKS...I GIVE U EXAMPLE..SIMPLE LNG ITO...

EXAMPLE LNG..10 METERS WIDE X 6 FEET HEIGTH.=KULANG KULANG N 2 METERS SO LET SAY 10M BY 2M = 20 M X 12.5 PCS.OF HOLLOW BLOCK /SQ.M STANDARD..= SO YOU NEED..250 PCS.HOLLOW BLOCKS..X 6 PESOS PCS.OF HB=1,500 PESOS..

LET SAY YUN 2.1 HCTRS..AY NK 100 SPAN NG 10M=150,000.PESOS N HOLLOW BLOCKS PLANG YAN..WLA PANG GRAVEL,CEMENT.STELL,PLYWOOD TO BE USE,AND MORE WOODS,AND LABOR AND THE OTHERS U NEED.
jong72 is offline   Reply With Quote
Old April 30th, 2008, 04:03 AM   #7
BrianK
Cyberfriends
 
BrianK's Avatar
 
Join Date: Mar 2007
Location: Grande Prairie
Posts: 7,320
Thanks: 163
Thanked 16 Times in 15 Posts
Re: magkano inabot pagpapabakod ng manukan nyo.....

Quote:
Originally Posted by gingerhat
Naku kung pader yan! mahal sir. aabutin ng Milliones yan! pag bireb wire 700 pesos ata per 100 meters. hindi pa kasama Poste. Ang maganda, Bired Wire nalang, tapos lagyan mo ng ASO sa mga Kanto ng Paligid mo. Then Lagay ka isang Bahay sa Gitna, na at least hangang 3rd floor ang taas. then lagyan mo ng Pang Snipper doon sa Taas.
tama ka tol. madugo ang magpabagod. lalo na pag hallow blocks ang pader mo. sa 1000 sqm. aabot ng 200k ang pagpapabakod kasama na ang labour at gate. ang materyales ay hallowblocks, bakal na post, diamond wire at barbwire.
BrianK is offline   Reply With Quote
Old April 30th, 2008, 05:04 AM   #8
a2y
Senior Member
 
a2y's Avatar
 
Join Date: Mar 2008
Location: land of cockers
Posts: 752
Thanks: 0
Thanked 0 Times in 0 Posts
Re: magkano inabot pagpapabakod ng manukan nyo.....

kung ako sa iyo pare,tulad ng sinabi ko ng una mga bahay kubo nalang sa
bawat sulok at gitna,tapos aso na pitbull.kung may pera ka wala
problema,pabakuran mo nalang,sama ako laborer bayadan mo nalang ako ng manokis mo.
a2y is offline   Reply With Quote
Old April 30th, 2008, 05:07 AM   #9
Desert Dust
Guest
 
Posts: n/a
Re: magkano inabot pagpapabakod ng manukan nyo.....

Quote:
Originally Posted by BrianK
tama ka tol. madugo ang magpabagod. lalo na pag hallow blocks ang pader mo. sa 1000 sqm. aabot ng 200k ang pagpapabakod kasama na ang labour at gate. ang materyales ay hallowblocks, bakal na post, diamond wire at barbwire.
HAbang papalaki ang lugar bumaba ang cost. ang perimeter ng 1 hect. is 400 m at ang 2 hect. ay 600 m kaya kung 200t ang estimate ng one hect. ay maaring 300t ang 2 hect. o mas mababa pa. kumuha ka ng maraming quote at magkakaroon ka ng idea kung anong gagawin mo. pwedeng sub mo ang labor o pwedeng pakontrata lahat pagaralan mong mabuti. mahirap lang kung ikaw ang mag patrabaho at hindi mo alam kung ano ang standard production ng mga mason, mas lugi ka pag nagkaganon. sa akin lang ang mabilis na mason ay kayang mag lay ng 400 a day for the first 5 blocks, tapos non bababa na ang production kasi pataas na. maraming teknik dyan para mabilis ang trabaho.

DD
  Reply With Quote
Old April 30th, 2008, 05:28 AM   #10
James Kiling
Guest
 
Posts: n/a
Re: magkano inabot pagpapabakod ng manukan nyo.....

OUCH !!! magastos pala.. sa panaginip na lang ako.
  Reply With Quote
Old April 30th, 2008, 05:40 AM   #11
Neil ma
Senior Member
 
Neil ma's Avatar
 
Join Date: Mar 2006
Posts: 819
Thanks: 0
Thanked 0 Times in 0 Posts
Re: magkano inabot pagpapabakod ng manukan nyo.....

Malaki ang gasto sa bakod 21 hectares pa naman. kung ilang ang tagapag alaga mo bigyan mo ng armalite lahat makamura ka. joke lang hehehehehehehehe
Neil ma is offline   Reply With Quote
Old April 30th, 2008, 05:43 AM   #12
kikiyo17ca
Senior Member
 
kikiyo17ca's Avatar
 
Join Date: Jul 2007
Location: MASINLOC-LAGUNA-CANADA
Posts: 679
Thanks: 0
Thanked 0 Times in 0 Posts
Re: magkano inabot pagpapabakod ng manukan nyo.....

Quote:
Originally Posted by James Kiling
OUCH !!! magastos pala.. sa panaginip na lang ako.

magastos nga yan!!!!..he he he he
kikiyo17ca is offline   Reply With Quote
Old April 30th, 2008, 05:49 AM   #13
alandenverdy
Senior Member
 
alandenverdy's Avatar
 
Join Date: Jan 2008
Location: sta maria bul
Posts: 522
Thanks: 2
Thanked 9 Times in 7 Posts
Re: magkano inabot pagpapabakod ng manukan nyo.....

mga sir ako po un conditioning area ko dito 500sqmter lng 300k nagastos,or more pa,8ft hallow block me extension pa 2ft barbwire buong paligigig semi finish pa.ubos ang kabuhayan hahahahaha
alandenverdy is offline   Reply With Quote
Old April 30th, 2008, 07:29 AM   #14
kidaw
Member
 
kidaw's Avatar
 
Join Date: Dec 2007
Posts: 206
Thanks: 1
Thanked 8 Times in 6 Posts
Re: magkano inabot pagpapabakod ng manukan nyo.....

sir, 2000 sq.mtrs 3 mtrs taas ng bakod 1.2 m po inabot 4 years ago
kidaw is offline   Reply With Quote
Old April 30th, 2008, 07:56 AM   #15
dbm174
Senior Member
 
dbm174's Avatar
 
Join Date: Jan 2005
Location: LA / BACOLOD
Posts: 1,057
Thanks: 0
Thanked 1 Time in 1 Post
Re: magkano inabot pagpapabakod ng manukan nyo.....

mga bossing...salamat po sa mga replies nyo.....

kakmeyt Neil ma....... 2.1 hectares po .......... di naman 21 ........

puede pa makahingi ng mga opinyun nyo boss............................
dbm174 is offline   Reply With Quote
Old April 30th, 2008, 08:01 AM   #16
kikiyo17ca
Senior Member
 
kikiyo17ca's Avatar
 
Join Date: Jul 2007
Location: MASINLOC-LAGUNA-CANADA
Posts: 679
Thanks: 0
Thanked 0 Times in 0 Posts
Re: magkano inabot pagpapabakod ng manukan nyo.....

up ko para makita ng iba....
kikiyo17ca is offline   Reply With Quote
Old April 30th, 2008, 01:29 PM   #17
RENEGADE
Senior Member
 
RENEGADE's Avatar
 
Join Date: Sep 2005
Location: Northern Cali
Posts: 753
Thanks: 0
Thanked 1 Time in 1 Post
Re: magkano inabot pagpapabakod ng manukan nyo.....

Quote:
Originally Posted by dbm174
tol tanong lang para magkaruon ako ng idea.....magkano ginastos nyo paglagay ng fence sa manukan nyo.........

gaaono kalaki farm nyo at anong materyales ginamit sa pagpapabakod.....hollowblocks..cyclone wire etc......ang taas.......at magkano inabot..........

ang manukan namin kasi mga 2.1 hectares...may temporaryong bakod...kawayan at barbwire pa lang............salamat
Pare heto estimate kong malapit...
2 has. say 600m. perimeter, 3m. height (15 blocks) hanggang pundasyon...
CHB
600m x 2.5chb/m x 15 = 22,500CHB x 5pesos/blocks = 112,500 pesos

DSB...deformed steel bars
Post in every 3m...600/3=200 posts need 2pcs. 10mm.dsb=400pcs x 172/bar = 68,800 pesos
dowells=1.5bars in every span= 200 x 1.5 = 300bars x 172/bar = 51,600 pesos
horizontal bars and foundation bars = 600 bars x 172/bar = 103,200 pesos
stirrups and G.I. wires etc...say 50,000 pesos

Cement...di ka lalayo sa 1,500bags x 190pesos/bag=285,000pesos

Gravel kasya dyan 4 truck load @ 12,500pesos/load = 50,000 pesos

Sand heto mura lang depende sa lugar sa 20,000 pesos

Forms, scaffoldings etc say 20,000pesos

Total Materials use.......761,100 pesos
Labor say 30%............228,330 pesos
Total Cost...................989,430 pesos yan pare plus yung kita ng contractor...sana makatulong sa mga nagbabalak magpabakod...ako hanggang balak palang

Pasensya na po kung may nakaligtaan ako....
RENEGADE is offline   Reply With Quote
Old April 30th, 2008, 01:55 PM   #18
kenian_castro
Member
 
kenian_castro's Avatar
 
Join Date: Jan 2005
Posts: 410
Thanks: 0
Thanked 0 Times in 0 Posts
Re: magkano inabot pagpapabakod ng manukan nyo.....

Quote:
Originally Posted by James Kiling
OUCH !!! magastos pala.. sa panaginip na lang ako.
bakod pa lang yan, paano na pag nilagyan mo ng manok at mga tao???
kenian_castro is offline   Reply With Quote
Old April 30th, 2008, 02:21 PM   #19
ccanlas1153
Senior Member
 
ccanlas1153's Avatar
 
Join Date: Jul 2006
Location: Florida/California/Bataan
Posts: 1,026
Thanks: 0
Thanked 0 Times in 0 Posts
Re: magkano inabot pagpapabakod ng manukan nyo.....

Year ago, hollow blocks. P1.25 M / hectare 8feet high ....
ccanlas1153 is offline   Reply With Quote
Old April 30th, 2008, 02:33 PM   #20
gingerhat
Member
 
gingerhat's Avatar
 
Join Date: Apr 2007
Posts: 345
Thanks: 0
Thanked 1 Time in 1 Post
Re: magkano inabot pagpapabakod ng manukan nyo.....

Quote:
Originally Posted by RENEGADE
Pare heto estimate kong malapit...
2 has. say 600m. perimeter, 3m. height (15 blocks) hanggang pundasyon...
CHB
600m x 2.5chb/m x 15 = 22,500CHB x 5pesos/blocks = 112,500 pesos

DSB...deformed steel bars
Post in every 3m...600/3=200 posts need 2pcs. 10mm.dsb=400pcs x 172/bar = 68,800 pesos
dowells=1.5bars in every span= 200 x 1.5 = 300bars x 172/bar = 51,600 pesos
horizontal bars and foundation bars = 600 bars x 172/bar = 103,200 pesos
stirrups and G.I. wires etc...say 50,000 pesos

Cement...di ka lalayo sa 1,500bags x 190pesos/bag=285,000pesos

Gravel kasya dyan 4 truck load @ 12,500pesos/load = 50,000 pesos

Sand heto mura lang depende sa lugar sa 20,000 pesos

Forms, scaffoldings etc say 20,000pesos

Total Materials use.......761,100 pesos
Labor say 30%............228,330 pesos
Total Cost...................989,430 pesos yan pare plus yung kita ng contractor...sana makatulong sa mga nagbabalak magpabakod...ako hanggang balak palang

Pasensya na po kung may nakaligtaan ako....


Nice Computation Sir................. Kung Ganyan ka mura ang aabuting, Hindi na lugi ang magpapabakod ng 2.1 hectars. GO GO GO na!

Last edited by gingerhat; April 30th, 2008 at 02:39 PM.
gingerhat is offline   Reply With Quote
Old April 30th, 2008, 02:37 PM   #21
rhandy
Senior Member
 
rhandy's Avatar
 
Join Date: Feb 2003
Location: philippines
Posts: 774
Thanks: 0
Thanked 1 Time in 1 Post
Re: magkano inabot pagpapabakod ng manukan nyo.....

1 million per hec ang gagastusin mo dyan dre
rhandy is offline   Reply With Quote
Old April 30th, 2008, 02:59 PM   #22
dhowwel
Member
 
dhowwel's Avatar
 
Join Date: Jan 2007
Location: QATAR
Posts: 223
Thanks: 0
Thanked 0 Times in 0 Posts
Re: magkano inabot pagpapabakod ng manukan nyo.....

Quote:
Originally Posted by rhandy
1 million per hec ang gagastusin mo dyan dre
I'll go for 1Million per hectare (min.)....

say: 1 Hectare (10,000 sq.meter) 100m x 100m ang Area
Perimeter = 400m/hectare
labor cost would be 40%....
Contractor's profit 15%-25% (material cost)

subst. mo lang yung value's sa calc. ni bro RENEGADE:
that would be
My own est.

Last edited by dhowwel; April 30th, 2008 at 03:07 PM.
dhowwel is offline   Reply With Quote
Old April 30th, 2008, 04:17 PM   #23
gingerhat
Member
 
gingerhat's Avatar
 
Join Date: Apr 2007
Posts: 345
Thanks: 0
Thanked 1 Time in 1 Post
Re: magkano inabot pagpapabakod ng manukan nyo.....

Sa akin, Bakod lang yan! wag mo na gamitan ng CONTRACTOR. Kung ano Diskarte mo sa Manok! ganun din diskarte ang i-enforce mo kung magtatayo ka ng bakod, Im sure it will only take 1 day to study everything in detail on what to do to your fence. Then by merely asking suggestion and looking at some of your friends fences, im sure you'll gain lots of ideas. Sigurado makakatipid ka ng 15-25% sa total cost mo. Kuha ka lang ng isang magaling na Laborer mo na special ang bayad at sya na tatayo as Foreman. Anyway, Ang BAKOD naman po ay hindi isang sensitive na structure na nakaka disgrasya ng tao, ang sa akin lang yung ibabayad mo pa na extra amount sa contractor, gamitin mo nalang dagdag sa pagpapatibay ng BAKOD mo. Sana Makatulong....
gingerhat is offline   Reply With Quote
Old April 30th, 2008, 05:39 PM   #24
dbm174
Senior Member
 
dbm174's Avatar
 
Join Date: Jan 2005
Location: LA / BACOLOD
Posts: 1,057
Thanks: 0
Thanked 1 Time in 1 Post
Re: magkano inabot pagpapabakod ng manukan nyo.....

Quote:
Originally Posted by RENEGADE
Pare heto estimate kong malapit...
2 has. say 600m. perimeter, 3m. height (15 blocks) hanggang pundasyon...
CHB
600m x 2.5chb/m x 15 = 22,500CHB x 5pesos/blocks = 112,500 pesos

DSB...deformed steel bars
Post in every 3m...600/3=200 posts need 2pcs. 10mm.dsb=400pcs x 172/bar = 68,800 pesos
dowells=1.5bars in every span= 200 x 1.5 = 300bars x 172/bar = 51,600 pesos
horizontal bars and foundation bars = 600 bars x 172/bar = 103,200 pesos
stirrups and G.I. wires etc...say 50,000 pesos

Cement...di ka lalayo sa 1,500bags x 190pesos/bag=285,000pesos

Gravel kasya dyan 4 truck load @ 12,500pesos/load = 50,000 pesos

Sand heto mura lang depende sa lugar sa 20,000 pesos

Forms, scaffoldings etc say 20,000pesos

Total Materials use.......761,100 pesos
Labor say 30%............228,330 pesos
Total Cost...................989,430 pesos yan pare plus yung kita ng contractor...sana makatulong sa mga nagbabalak magpabakod...ako hanggang balak palang

Pasensya na po kung may nakaligtaan ako....

Kakmeyt Renegade.....salamat at very detailed ang paliwanag mo...siguro plus/minus na lang sa cost..........


Kasi mga 2 1/2 years ago nagpa estimate na ko sa contractor.....hollow blocks na pader mga 8-10 ft. high if i recall correctly.....tapos may kasama mga lamp posts sa 4 corners at gate sa front........at iba pang mga maliliit na detalye...........

Ang estimate niya lahat lahat na umabot ng P2.5M.....................

Kelangan talaga magtanong pa sa iba ng maigi..........................
dbm174 is offline   Reply With Quote
Old May 1st, 2008, 01:54 AM   #25
a2y
Senior Member
 
a2y's Avatar
 
Join Date: Mar 2008
Location: land of cockers
Posts: 752
Thanks: 0
Thanked 0 Times in 0 Posts
Re: magkano inabot pagpapabakod ng manukan nyo.....

pare milyon na yang pinag uusapan jan sa bakod a.aba issabong ko muna mga
manokis para makakuha ng pambili ng gagamitin para sakanila.
renegade tanong lang sir,magaling kayo sa kwentahan e ako magpapabakod
din kaya lang di ko alam kung magkano magagastos.sabihin nalang natin na 3000 thou.
na hollowblocks ang magagamit.di ko sure ang sukat ng lote pero ang stemate sa hollowblocks
3000thou ang magagamit.maliit lang naman yung lote ko.kasi konte lang manokis ko e.thanks
a2y is offline   Reply With Quote
Old May 1st, 2008, 04:46 AM   #26
BrianK
Cyberfriends
 
BrianK's Avatar
 
Join Date: Mar 2007
Location: Grande Prairie
Posts: 7,320
Thanks: 163
Thanked 16 Times in 15 Posts
Re: magkano inabot pagpapabakod ng manukan nyo.....

Yung lupa sa pangasinan ay 2.4 hectares kaya gagawin ko doon ay papataniman ko ng buko sa boundery ng lupa at pagmalaki na ang niyog at palilibutan ko na lang ng diamond wire at fishnet na luma, sabay magtali na lang ng aso kasi makapagpatayo na ako ng bahay sa 2.5M parang ang hiap bitawan ng 2.5 M kung bakod pa lang, wala pang facilities..... sa ngayon rent lang muna ako. 5k lang rent ko sa 5000 sqm na property. habang hinihintay kong lumaki ang puno ng niyog.
BrianK is offline   Reply With Quote
Old May 1st, 2008, 05:58 AM   #27
kikiyo17ca
Senior Member
 
kikiyo17ca's Avatar
 
Join Date: Jul 2007
Location: MASINLOC-LAGUNA-CANADA
Posts: 679
Thanks: 0
Thanked 0 Times in 0 Posts
Re: magkano inabot pagpapabakod ng manukan nyo.....

Quote:
Originally Posted by kenian_castro
bakod pa lang yan, paano na pag nilagyan mo ng manok at mga tao???
lalong aray
kikiyo17ca is offline   Reply With Quote
Old May 1st, 2008, 01:08 PM   #28
RENEGADE
Senior Member
 
RENEGADE's Avatar
 
Join Date: Sep 2005
Location: Northern Cali
Posts: 753
Thanks: 0
Thanked 1 Time in 1 Post
Re: magkano inabot pagpapabakod ng manukan nyo.....

Quote:
Originally Posted by a2y
pare milyon na yang pinag uusapan jan sa bakod a.aba issabong ko muna mga
manokis para makakuha ng pambili ng gagamitin para sakanila.
renegade tanong lang sir,magaling kayo sa kwentahan e ako magpapabakod
din kaya lang di ko alam kung magkano magagastos.sabihin nalang natin na 3000 thou.
na hollowblocks ang magagamit.di ko sure ang sukat ng lote pero ang stemate sa hollowblocks
3000thou ang magagamit.maliit lang naman yung lote ko.kasi konte lang manokis ko e.thanks
Pare di ka lalayo sa 100k dyan...may pinababakuran din ako ngayon nakaka 200k na ako di pa ako nangalahati, sabagay kasama na mga flypens...ang area ay half hectare...ang masasabi ko lang iba rin kung ikaw mismo magpabakod kasi mga laborer kung wala ka inuunti-unti lang trabaho syempre nga naman kung tapos agad di wala na silang kayod


RENEGADE is offline   Reply With Quote
Old May 1st, 2008, 10:20 PM   #29
a2y
Senior Member
 
a2y's Avatar
 
Join Date: Mar 2008
Location: land of cockers
Posts: 752
Thanks: 0
Thanked 0 Times in 0 Posts
Re: magkano inabot pagpapabakod ng manukan nyo.....

Quote:
Originally Posted by RENEGADE
Pare di ka lalayo sa 100k dyan...may pinababakuran din ako ngayon nakaka 200k na ako di pa ako nangalahati, sabagay kasama na mga flypens...ang area ay half hectare...ang masasabi ko lang iba rin kung ikaw mismo magpabakod kasi mga laborer kung wala ka inuunti-unti lang trabaho syempre nga naman kung tapos agad di wala na silang kayod

http://i285.photobucket.com/albums/l...rm/FlyPen3.jpg
http://i285.photobucket.com/albums/l...rm/flypen2.jpg
pare okey mga flypen,nakavision narin yan sakin.kasi mga flypen ko sa amin
e mga kawayan lang.okey tignan,pero mas maganda semento.gastos lang talaga
manokis natin ano.hehe special pa kay misis.hahaha
a2y is offline   Reply With Quote
Old May 1st, 2008, 10:42 PM   #30
MARVZ
Senior Member
 
MARVZ's Avatar
 
Join Date: Apr 2007
Location: N. Samar
Posts: 1,082
Thanks: 5
Thanked 3 Times in 3 Posts
Re: magkano inabot pagpapabakod ng manukan nyo.....

Last year binakuran namin lupa ng boss ko 2.7 hec. Conrete, 8 feet high. Sariling patrabaho umabot 1.85 million.
MARVZ is offline   Reply With Quote
Reply

Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump

Similar Threads
Thread Thread Starter Forum Replies Last Post
magkano inabot pagpapagawa ng RUEDA sa farm niyo..... dbm174 Usapang Manok 52 February 4th, 2013 02:23 AM
Disinfectant sa manukan tjcock Usapang Manok 15 July 25th, 2011 09:56 PM
Manukan!! loszetas Chit-Chat 17 June 14th, 2011 12:45 AM
tao sa manukan ugoy14344 Usapang Manok 11 October 8th, 2009 06:58 AM
kaninong manukan? drj_67 Usapang Manok 0 April 27th, 2006 07:38 PM

All times are GMT +8. The time now is 03:00 PM.

3.8.7